Skip to main content
  • Lindell Yachts

Location: Burlington, Washington

Project Overview

JTK Engineer provided mechanical engineering for the new yacht manufacturing and office building.  The manufacturing portion of the building is comprised of three main areas:
  • Gel Coat
  • Lamination/Grind
  • Finish/Assembly

Specialty systems in the building include:
  • NESHAP Filtration and Exhaust
  • Dust Collection 
  • 100% Outside Air Capable Rooftop Air Handlers
    • Design to reduce outside air and operate in return air mode during times when production is not taking place to conserve energy.
  • Chemical Storage Exhaust

The office portion of the building is served by a hig- efficiency energy recovery outside air unit operating at over 83% sensible recovery.  The heating and cooling for the office portions of the building are provided by variable refrigerant heat pumps.

Project Details:
Location: Burlington, WA
Size: 36,029 SF
Owner: BLJN Holdings, LLC
General Contractor: Chad Fisher Construction
Mechanical Contractor: Nordic Temperature Control
Services: HVAC
Market Sector: Retail/Office & Industrial/Manufacturing


Project Gallery

Explore our project photo gallery showcasing our work for Lindell Yachts.

Markets We Serve

Our breadth of experience spans both private and public sectors covering a diverse array of projects for clients in nearly every market sector including:

Hospitality

Educational Facilities

Food Processing

Restaurants/Kitchen

Industrial/Manufacturing

Civic

Energy

Gaming/Tribal

Retail

Agriculture

Fitness/Recreation

Single Family/Residential

Multifamily/Mixed Use

Hangars

Warehouses/Storage

Assessments/Auditing

Cold Storage

Healthcare

Contact Us Today!

Call Us
EMAIL US
Reach Out Here